![ricoh bk5010e plockmatic booklet maker not cutting straight ricoh bk5010e plockmatic booklet maker not cutting straight](https://www.copytechnet.com/forums/avatars/taytaythetechnician.gif)
![ricoh bk5010e plockmatic booklet maker not cutting straight ricoh bk5010e plockmatic booklet maker not cutting straight](https://www.argecy.com/images/c901_c901ga_plus_header.jpg)
![ricoh bk5010e plockmatic booklet maker not cutting straight ricoh bk5010e plockmatic booklet maker not cutting straight](https://www.picclickimg.com/d/l400/pict/203558664128_/Plockmatic-HCI3500-Ricoh-high-capacity-interposer.jpg)
The contractor shall provide to the evaluator upon request summary of preventive maintenance work and inspections completed. Associated documents, records, and reports to be produced and maintained include: Electrical Preventive Maintenance Records and Reports (EPMI). The contractor is encouraged to identifl and recommend technological advances, changes, or other improvements to the airfield lighting and distribution systems that will improve systems efficiency, reduce required maintenance, or otherwise lower costs to the government Technical Documentation. The airfield lighting and distribution systems shall be operated as required to supply visual aid for aircraft operations 24 hours per day, every day throughout the year Systems Improvements. Operations shall be in accordance with applicable health and safety regulatory agency standards Continuous Operation. The procedures shall comply with NFPA 70B, NEC, NESC, FAA AC, manufacturer's instructions, industry standards, and national, state, and local codes. The contractor shall maintain complete control of the airfield lighting and distribution systems operation at Galena FOB and the taxiway circuit at King Salmon FOB.
#Ricoh bk5010e plockmatic booklet maker not cutting straight manual
Other equipment to be considered often includes some of the following: automatic and manual transfer switches grounding devices distribution transformers instrument and other specialty transformers low voltage circuit breakers and fuses cutout devices shutdown devices and alarm systems for dangerous or out-ofcontrol conditions.9.4 Airfield Lighting and Distribution Systems Operation Operation Procedures. This critical equipment shall be identified by the contractor but shall include, at a minimum, regulators, power transformers, lighting circuits (cable, splices, and isolation transformers), circuit interrupting and protective devices, including relays, interlocks, and controls. Specific tests and predictive maintenance is required for equipment (including parts of systems) that is critical for continued operation of the airfield lighting system. The contractor shall coordinate EPMI downtime of airfield lighting systems with the CO.9.3 Critical Equipment. Proposed EPMI schedule changes shall be submitted to the CO for approval. The contractor shall perform EPMI according to the approved schedule unless unexpected failures occur or optimum maintenance intervals are reached for each item of equipment. contractor shall replace or repair items not functioning properly or needing repair. 1 F COOO2, PO005 Section J, Attachment 6, Section IStatement of Work perform EPMI to minimize the total cost of maintenance, repairs and replacement.